I was just at the Primm location last night (just craving a little drive time in the tesla from las vegas) It looks about 7-10 days away depending on the speed of the install and configuration. All the underground work is done. The trenching to the utilities is done - all of the concrete build ups are done. It's essentially legos and wiring now
I'm excited to see this one open! I HATE top off charging at Barstow and the socal trip taking sooooooo long! Thanks Tesla for listening to us all! Now just one more in Baker and we could go as fast as we WANTED to thru the canyons! Hope to see everyone soon!
AJ