preilly44
Member
So I just had my panels installed (19.25kw) and I'm waiting for the electric company to switch out my meter to a netmeter so I can be paid for my overproduction. They shut off the system until the netmeter is installed but the installer hinted that I could turn on the system and get free electricity, I just wouldn't get paid for my over production. I wasn't planning on doing this but I just read an article that said my electric company has the slowest average time out of the 13 states in the study (78 days average to swap out the meter).
What are your thoughts and what would/did you do?
Thanks!
What are your thoughts and what would/did you do?
Thanks!