yup.. there is one solution with quite few batteries which can offload 150 kw where infrastructure is not up to scratch. but not sure if there is huge interest of investing like thisThey should look into battery and solar. Infact a lot of places should do so they can both take some load off the grid and also spread that load out as required. You’ve got to figure most services have a ton of roof space for solar.