A posting on our FB Page just identified construction has begun!
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Tucson mailing addresses extend all the way to the south side of Tangerine Rd, far North of this address. I own houses just on the south side of Tangerine and Twin Peaks and they are Tucson, even though they are covered my Marana City. Site should def be changed to Tucson-Marana .I got my information from Google Maps. It's not like I would be intimately familiar with the precise boundaries
And they're now likely to add something else to the name as well. Might as well leave it and change it when it's officially live.Tesla will name it what they name it. Updates should focus on construction progress.
And yet still no one has mark this as under construction. I talk to the manager at fire house subs over the weekend and they confirmed the Tesla Supercharger behind their building and was excited to have it there to bring in new customersThey’ve fully trenched everything from the looks of it. No equipment here yet.
The online e-file still shows that the building permit hasn't yet been issued and no contractor named. Likely this is just outdated information, but until it says otherwise and/or starts showing inspection results or someone sees identifiable Tesla supercharger equipment on location at the construction site and reports it here, SC.info isn't likely to update the status to construction.And yet still no one has mark this as under construction.
I think it was already more then official to update to construction before. Not sure why the holdback.Equipment is on site now.
Conduit in the hole
Official enough now for superchar.info?
@MarcoRP
View attachment 739881
Marcorp
Unofficial policy for SC.info developed over years of dealing with occassionally erroneous or untimely updates by well-meaning people who were given bad information or misinterpreted what they heard or saw. Was anything lost by holding back on updating the status for a few days? Not really, only SC.info's status for the site was lagging reality by a few extra days.I think it was already more then official to update to construction before. Not sure why the holdback.
I agree- and I 'm sorry if I sounded snarky in my earlier posting. I was trying to get it posted while sitting in the car after snapping the photo.Unofficial policy for SC.info developed over years of dealing with occassionally erroneous or untimely updates by well-meaning people who were given bad information or misinterpreted what they heard or saw. Was anything lost by holding back on updating the status for a few days? Not really, only SC.info's status for the site was lagging reality by a few extra days.
Your picture shows at least 3 and maybe a 4th supercharger cabinets, each of which are normally connected to 4 supercharger stalls. So that means 12 or 16, depending on whether there's actually a 4th cabinet not quite visible. But there are also 8 brown boxes which each contain 2 charging posts, so 16 stalls is looking pretty confirmed already.I did't count the number of stalls yet. They were putting in conduit and risers, so it should be easy to count next time I stop by.
There were 4 Tesla Energy marked pallets - I'll try to take better photos next time I stop by there-Your picture shows at least 3 and maybe a 4th supercharger cabinets, each of which are normally connected to 4 supercharger stalls. So that means 12 or 16, depending on whether there's actually a 4th cabinet not quite visible. But there are also 8 brown boxes which each contain 2 charging posts, so 16 stalls is looking pretty confirmed already.