MoosejawShaw
Member
Looks like V3. As all the other TCan sites, that are waiting for pedestals and cabinets. Also no transformer yet. Pictures as of 4pm today. Beaten to the punch.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Nice pics, thanks. But you're wrong about the type. They'll be V2 (150 kW), not V3. In your pic of the cabinets' location showing the bagged wire loops you can see that there will be four cabinets. Also, in the picture before that one, you can see that there are 4 autotransformers (the small white boxes). 4 cabinets and 4 AT for 8 stalls means it's V2. And it's a bit hard to see because of the bags/wires, but a close look also shows the conduit stubs for the cabinets are in the V2 pattern.Looks like V3. As all the other TCan sites, that are waiting for pedestals and cabinets. Also no transformer yet. Pictures as of 4pm today. Beaten to the punch.
Nice pics, thanks. But you're wrong about the type. They'll be V2 (150 kW), not V3. In your pic of the cabinets' location showing the bagged wire loops you can see that there will be four cabinets. Also, in the picture before that one, you can see that there are 4 autotransformers (the small white boxes). 4 cabinets and 4 AT for 8 stalls means it's V2. And it's a bit hard to see because of the bags/wires, but a close look also shows the conduit stubs for the cabinets are in the V2 pattern.
Yes that would seem correct with the auto transformers. Thanks for the correction. Just hope they get done.
And they’re operational! One of the DCFCs and both J1772s, that is. The rest of the chargers should be operational within 1 week as all the Superchargers have been installed. Photos from PlugShare...
And they’re operational! One of the DCFCs and both J1772s, that is. The rest of the chargers should be operational within 1 week per the Ioniq driver as all the Superchargers have been installed. Photos from PlugShareView attachment 475652View attachment 475653
Yeah, those bagged wires/conduit in the background of the first picture are where the supercharger cabinets will go when they eventually get installed. Odd that the hold up is for the cabinets this time instead of the pedestals. Regardless, based on that picture, it's not looking at all likely that the Tesla portion will be online within the next week.And how very Maine, seeing those black bags over the Tesla conduit in the background.
Both DCFCs are working and the cabinets are on site! Photo from PlugShareAnd how very Maine, seeing those black bags over the Tesla conduit in the background.
Winter Is Coming. We'll have our first settling snow in Central Maine this evening.
Plenty of patience here - just trying to plan a year-end road trip or two with crowd-sourced dataSunday December 9 2019 Drove by on way back from Sugarloaf, this looks so ready...
But no juice. ;(
Prius Plug in was using Charge-point charger while shopping at the local Hannaford Grocery
Patience grasshopper.............
Sunday December 9 2019 Drove by on way back from Sugarloaf, this looks so ready...
But no juice. ;(
Prius Plug in was using Charge-point charger while shopping at the local Hannaford Grocery
Patience grasshopper.............