This is concerning. It’s been I believe a year and a half (18 months) since inception when we found out about this site according to the beginning of this thread. This is one of the most painful build outs I’ve seen. What’s it going to take?Definitely a little concerned about this. Moved down here from Dublin, OH. The supercharger there (on Sawmill Rd./Meijers) was built out and then sat unpowered for close to 14 months. Not sure if that was a power or legal issue, but either way -- I want Florence lit up. My 6mi/hr on the home outlet drip isn't ideal.
Ski