The expansion is nice but really need to expand more. There was a wait for this on Sat 4/9. Plus if you got stuck on a 150kw shared stall the time to charge was almost 40 mins. Luckily most do not know which stalls are 250kw so I was able to move over to a 250kw and get the charge I needed within 10 mins and made it to Ehrenberg. Hopefully they will add more stalls or make a new location around here for those of us coming from North Scottsdale or Gilbert and were not able to leave at above 80%.