I 100% agree with your response. This was something I heard/read online, I need to find the source. Perhaps that information is incorrect? Since my conduit run involved around 125ft, had to be placed on wooden studs as a part of the building code, combining low voltage circuits to make room to add a 60A breaker, all while my solar panels are pending their own inspection approval the City was not something that I wanted to tackle on my own. I attached part of the contract that shows both permit fees. I had to photoshop some information out to protect both parties.