NEC 625 only makes an exception for "125 volt, single phase, 15 or 20 amperes". The 30 amp will require the same kind of signaling as any 240V source. This requirement will apply to J1772 equipped vehicles too (which means the 120V cord in the Leaf and Volt won't be able to use the 30 amps either).