I was doing some research and noticed the below document on fremont.gov dated June 6, 2019:
http://www.fremont.gov/DocumentCenter/View/41606/PLN2018_00212-Info-1?bidId=
On the Tesla 2017 10K, the leased 302,400 SF building is listed as "Engineering". It has per the above document:
Looks like an awesome place to test Maxwell batteries.
http://www.fremont.gov/DocumentCenter/View/41606/PLN2018_00212-Info-1?bidId=
On the Tesla 2017 10K, the leased 302,400 SF building is listed as "Engineering". It has per the above document:
Vehicle Testing Area – 165,500 SF
• Crash Track
• Crash Sled
• Test Chambers
• Vehicles Lifts
• Labs
Future Energy Reliability Lab – 8,500 SF
• Test Chambers
• Workshop
• Solar Energy Product Testing Equipment
Future Office – 28,500 SF
• Open Office Areas (approximately 300 desks)
• Conference Rooms
• Collaboration Areas
• Lobby
Future Catering Café – 4,800 SF
• Dining Area
• Catering Servery
• Food Prep/ Dry Storage
Future R&D Spaces – 91,600 SF
· Labs
· Vehicle Lifts
· Test Chambers
· Workshops
· Storages
Total current area (excluding future area) = 165,500 SF
Total future area = 133,400
Total building area = 298,900
Total allowable area (ground floor and mezzanine) = 312,375 SF
Looks like an awesome place to test Maxwell batteries.