World’s First Offshore Wind Repowering Completed in Sweden
This works out to 3.4 US cents a kWh over the next 15 year lifetime, excluding financing and O&M. It is great news that the infrastructure can be re-used.
:: two thumbs up ::
The truly interesting snippet in the article was that the turbine size refurbishment was limited by the transmission cable. Had they been able to take advantage of more capacity, plans to increase the turbines to 5 MW instead or the original 500 kW would have been considered.
This works out to 3.4 US cents a kWh over the next 15 year lifetime, excluding financing and O&M. It is great news that the infrastructure can be re-used.
:: two thumbs up ::
The truly interesting snippet in the article was that the turbine size refurbishment was limited by the transmission cable. Had they been able to take advantage of more capacity, plans to increase the turbines to 5 MW instead or the original 500 kW would have been considered.