That is great news!I have good news to report. They have started construction at the site at the orchard valley mall. The site is the same one that the Manteca planners approved. It is just west of the bass pro shops store on the outer perimeter road of the mall. Access is very easy from the entrance just east if bass pro. No need to get mixed up with shopper traffic if you go around on the east perimeter.
I'd pretty much given up on Manteca after Tesla cancelled it post permit approval. Trips to Tahoe will soon be much easier.