You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Tesla's Supercharger Team was recently laid off. We discuss what this means for the company on today's TMC Podcast streaming live at 1PM PDT. You can watch on X or on YouTube where you can participate in the live chat.
Aww I had missed the replies to this thread since Thursday! I drove by on my way home last night and snagged these pictures. All of the stalls look installed (and shiny new)
The transformer will get installed on the slab between the Emporia West Plaza sign and the first bit of Tesla equipment in the background. The pad is visible in the pictures posted in #107. If you enlarge the images, you can see the pipes sticking out of the ground in post #152 as well. This site won't get powered up until the transformer that is likely a 5' green cube gets installed there.
Aww I had missed the replies to this thread since Thursday! I drove by on my way home last night and snagged these pictures. All of the stalls look installed (and shiny new)View attachment 515021View attachment 515022
Not to be a bother, but I'm about to get this model and will be making this drive a lot. Do you mind sharing roughly what part of KC you left from (or just a rough estimate of total miles), SoC when you left and if you went over the speed limit?
Getting from KC to SE Wichita is what, 200 miles? To get there on 4% assuming the weather was like ~55 is scary from an efficiency perspective.