R
ReddyLeaf
Guest
FYI, I forgot to mention that I also checked on the 3rd Street downtown EBurg charging stations (Google Maps) for new construction, which is now in progress. A few months back, the local utility added 3-phase transformers to the pole at the SW corner. Now it looks like the concrete forms have been started for the charger placement. It might be done this summer, so check Plugshare. This could be useful overflow for those with a Chademo adapter.
No, unfortunately, this is NOT a SC, but rather an extension of the WA Electric Highways, partially funded through our $150/yr license fee. This will be a single, dual-headed Chademo/CCS DCQC, with service provided for possible future expansion to two stations. There will be nine additional locations in Eastern WA and nine additional stations on I-5. More info here:
https://www.wsdot.wa.gov/NR/rdonlyres/0DED5F62-5C83-456A-BD26-6176941A5F29/0/EVIPP_NOPA.pdf
No, unfortunately, this is NOT a SC, but rather an extension of the WA Electric Highways, partially funded through our $150/yr license fee. This will be a single, dual-headed Chademo/CCS DCQC, with service provided for possible future expansion to two stations. There will be nine additional locations in Eastern WA and nine additional stations on I-5. More info here:
https://www.wsdot.wa.gov/NR/rdonlyres/0DED5F62-5C83-456A-BD26-6176941A5F29/0/EVIPP_NOPA.pdf