Thanks for the tip on Esc.
Agree possibly some amendments to addresses in Phase One in those Phase Two entries.
Tesla has 15 at Raymond Terrace Phase One, 10 at Heatherbrae Phase Two, all very near an existing site.
Similarly 15 at Coffs Harbour in Phase One and Phase Two with existing site.
Ballina / Byron (Ewingadale) probably far enough apart.
--
Evie has proposed an 8-stall site at Bondi Beach, Merrylands, Tempe, Wolli Creek. Most of the others are 4-stall.
Gemtek has seemingly worked on the NRMA rollout, so maybe connected?
We supply the world’s leading brands with Electric Vehicle charging hardware and software. Contact us today.
gemtek.com.au
But NRMA also has some new city sites under its own name - Cammeray, Dapto
And good to see U or Wollongong getting funding.
Without being able to dump the data I'd say Evie and Viva are the big winners.
--
Tritium has previously flagged the PKM400 in calls though hasn't formally launched it.
Our technology road map sees us launching a Buy America and NEVI-compliant 400-kilowatt modular and scalable charger in 2024, which will be a fully liquid cooled and IP65-rated distributed charging system. We’ve already received a high level of interest from existing and potential customers to purchase units as soon as they become available in the second half of 2024