I'm in the UK and recently purchased a used 75D 2017. I thought the car maxed out at about 11kW on AC 3 phase charging (16A). But I plugged into a public 22kW AC 3 phase charger and I was pleasantly surprised to see it charging at a rate of around 16.5 to 17kW.
I vaguely remember 11kW (16A, 3 phase) was standard charging and the high powered charger was 16.5kW (24A, 3 phase) but this was an optional extra.
So question is, was this higher power an optional extra or was it standard?
I vaguely remember 11kW (16A, 3 phase) was standard charging and the high powered charger was 16.5kW (24A, 3 phase) but this was an optional extra.
So question is, was this higher power an optional extra or was it standard?