Our local (Santa Barbara County) building department wrote a correction on our plans that appear to require a special ventilation system interlocked with the Tesla unless we can show that the charging system is "listed for indoor use". The code section they cited is in the California Residential Building Code Section 328 (attached). Has anyone had any experience with this? I'm not sure how to respond to this correction.