Wow, I suspect I am in… 7 days to jump from ELRP to DSGS! My VPP screen shows 2824 Fleet Homes participating and clicking the Program Facts both suggest I am switched over.

Do newcomers have to wait until June to start receiving VPP-DSGS events? Did anyone get any May events?
 

Attachments

  • IMG_4071.jpeg
    IMG_4071.jpeg
    172.6 KB · Views: 5
  • IMG_4072.jpeg
    IMG_4072.jpeg
    250.4 KB · Views: 3
Wow, I suspect I am in… 7 days to jump from ELRP to DSGS! My VPP screen shows 2824 Fleet Homes participating and clicking the Program Facts both suggest I am switched over.

Do newcomers have to wait until June to start receiving VPP-DSGS events? Did anyone get any May events?
I also got in the DSGS with a very short wait just about a week.

I did not hear about any events in May this year.
 
  • Like
Reactions: SoundDaTrumpet
The original ELRP program was mostly Aug.ust and September, but there were also non-CASIO alert test events in June and July. When I went through the original program information, in pretty sure that there was a commitment of at least one event in each month. I'll need to find the specifics.
I see the language as well that there is to be one event per month, and no more than 35 per year.
 
I see the language as well that there is to be one event per month, and no more than 35 per year.
This is noted here: https://www.tesla.com/support/energy/virtual-power-plant/dsgs
Participation
Once you are enrolled in the program, Tesla will call upon the Virtual Power Plant when wholesale electricity prices exceed $200/MWh. When these events occur, your Powerwall will dispatch energy back to the grid. You can expect events to occur between May and October, from 4 PM to 9 PM. Events will be no longer than two hours. There will be at least one event per month with no more than 35 events each summer.
Looks like I confused the ELRP maximum of 60 hours with the DSGS maximum of 70 hours.