I continue to see it referenced that the Grohmann built battery pack lines have not been installed or are not operational. I must have missed where this was stated. Can anyone point me to the source? Sorry if already posted.I would think we still need the Grohman lines to hit 5000/week, and I wouldn't expect them to be fully operational until June.
I hope this is preparation for AWD, though I hoped the same thing last time. While we are battery pack limited, Tesla should maximize revenue per pack.