They just need an electrical final, which should be easy to get, given they have the service turned on already. He just will look at the pedestals and two lights.
At Leesburg the installers had left power on and the site automatically turned on when power was turned on. I know they had a lot of issues charging at a high rate,and don't know when Tesla showed up and calibrated the units.