Have no idea what all the construction steps are but looking nearly done to my unknowledgeable eye. The power transformers are all installed and 9 charging stations are likewise set on their concrete pads. Still covered by clear plastic without the charging cables installed. Located at the West side of the Embassy Suites Hotel next to I25 but mostly shielded from view from I25 by a hill.
weradln
S60D with AP2 on order.
weradln
S60D with AP2 on order.