You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
On Lincoln's permit site, the permit was closed this morning and under the inspection section it was updated to as approved. So from the city's end this site is good to go.
An odd tweet from them. The former happend yesterday as I posted in this thread and the latter (non Tesla related) was announced today. The Omaha subtweet (if accurate) is more interesting as that site had seemingly been running ahead of Lincoln and none of the permit inspection notes seemed that major.
Just looked up this site on my app. So, like Wisconsin, Iowa SC's charge by the minute, by the kW speed. Absolutely need to pre-heat the battery before a charge to save $$. And both Lincoln sites are at or very near a Runza. Sweet!
Just looked up this site on my app. So, like Wisconsin, Iowa SC's charge by the minute, by the kW speed. Absolutely need to pre-heat the battery before a charge to save $$. And both Lincoln sites are at or very near a Runza. Sweet!
Just looked up this site on my app. So, like Wisconsin, Iowa SC's charge by the minute, by the kW speed. Absolutely need to pre-heat the battery before a charge to save $$. And both Lincoln sites are at or very near a Runza. Sweet!