Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. Tdreamer

    Wiki Superchargers Visited

    A belated summary of my trip home from Custer. My trip out to Custer included an HVAC issue that limped along until I got down to Kentucky, where it decided enough was enough. Beyond leaving me driving along in a high priced convection oven, it's failure state resulted in a high voltage...
  2. Tdreamer

    Supercharger - Peabody, MA

    V4 posts are taller than V2/V3 posts, and are solid and look similar to the 72kW urban supercharger posts (no center cutout for cable management). You can see them in the third picture just to the right of the white excavator. This is the crew's second V4 post installation (Cromwell, CT being...
  3. Tdreamer

    Supercharger - Cromwell, CT

    Follow up - possum rescued by animal control 😊 with thanks to a friend for making the call
  4. Tdreamer

    Supercharger - Peabody, MA

    I spy… v4 posts in one of those pictures 😊
  5. Tdreamer

    Supercharger - Scarborough, ME

    It’s possible it could get MagicDock - I think that has typically been retrofitted by Tesla for most sites that have it.
  6. Tdreamer

    Supercharger - Cromwell, CT

    A quick visit on my way by… someone’s on the hole not sure they can get out 😔
  7. Tdreamer

    Supercharger - Woodbridge, VA - Richmond Hwy

    Stopped by. Still off. Odd shrine by one post.
  8. Tdreamer

    Supercharger - Charlottesville, VA

    Sites can be marked down for firmware updates. That may have been what was happening.
  9. Tdreamer

    Supercharger - Lexington, VA - Hotel Drive

    Stopped by today on my way through the area. The transformer and meter are live. An initial asphalt coat has been put down the center of the lot but not in front of the superchargers or parking spaces. Definitely more finish work needed around the superchargers but it should be quick.
  10. Tdreamer

    Supercharger - Alcoa, TN

    Still nothing…
  11. Tdreamer

    Supercharger - Peabody, MA

    Just got encouraging news that Peabody has begun construction! This may be one of the first jobs begun after the big red pause button was pushed by Tesla. There is hope. Anyone nearby willing/able to swing by and grab a photo to share (I'd run up there but am currently out-of-state on a road...
  12. Tdreamer

    Supercharger - Peabody, MA

    Permits approved for this project on May 10th, 2024. Hopefully this project will go forward once the dust settles. I assume this project is ready to start once given the go-ahead by Tesla and the contractor can schedule it.
  13. Tdreamer

    Supercharger - Cornersville, TN

    Nice site layout. Two ADA stalls and more importantly, 4 stalls in the center enabling trailer pull-through.
  14. Tdreamer

    Wiki Superchargers Visited

    A belated post summarizing my route to Custer this year. Gotta love road tripping bugs and Canadian grime. Check-ins for 2024-05-12 - Gansevoort, NY (#1370) - Chestertown, NY (#1371) - North Hudson, NY (#1372) - Lake Placid, NY (#1373) - Potsdam, NY (#1374) - Morrisburg, ON (#1375)...
  15. Tdreamer

    Supercharger - Woodbridge, VA - Richmond Hwy

    Was just reviewing this site as I may be swinging through the area in a few weeks. In the photos in the 4/21 post Supercharger - Woodbridge, VA - Richmond Hwy (and subsequent photos of the posts), the stalls are numbered. That means the supercharger team has already been by and at least...
  16. Tdreamer

    Supercharger - Scarborough, ME

    A few photos posted today on Facebook
  17. Tdreamer

    Supercharger - Cromwell, CT

    A photo shared on Facebook taken today - crew onsite continuing the build.
  18. Tdreamer

    Supercharger - Lincoln, NH

    At this point, I would be pretty sure that charging non-Tesla vehicles at this v3 4 post expansion will not currently work. It's hard to say if Tesla will enable this expansion in the future - that will likely require hardware upgrades to the posts and supercharger cabinet itself to do. The...
  19. Tdreamer

    Supercharger - Norwalk, CT

    Updated overall site plan dated 4/23/2024 incorporating changes from reviews to-date. Still 36 superchargers in the plan (7 4-post PSU's and 8 traditional posts with 4 of them being ADA compliant). Overall project still in the preliminary design/review phase. With the Tesla supercharging team...
  20. Tdreamer

    Supercharger - Dover, NH

    Last update I heard was probably 3-4 weeks ago was the site was waiting for some final utility work in the area before it was clear to have Tesla commission. That work *should* have been completed and the site ready for Tesla. With the chaos at Tesla and inability for contractors & utilities...
  21. Tdreamer

    Supercharger - Franklin, NC

    The Tesla app while still showing the site as temporarily closed, suggests 10/12 stalls available.
  22. Tdreamer

    Supercharger - Franklin, NC

    I'm likely passing through this site in a few weeks - really hoping it will be open (unlikely if I had to guess).
  23. Tdreamer

    Supercharger - Canton, MA

    Good question - the site data is 250, so it should show 250 kW. @corywright
  24. Tdreamer

    Supercharger - Berlin, VT

    Absolutely nothing on the radar that I've heard of - and I agree, I-89 could use coverage.
  25. Tdreamer

    Supercharger - Lincoln, NH

    And the expansion is live.
  26. Tdreamer

    Supercharger - Lawrence, MA

    It delivered a normal rate of charge for me when I visited the site Friday.
  27. Tdreamer

    Supercharger - Lawrence, MA

    All three are up and working (from personal experience charging at all three) - by all three, I include Canton, MA which is still vacant on the maps for some reason, but working. I'm guessing due to the fact that it has MagicDock and may be more complex to complete final commissioning or...
  28. Tdreamer

    Supercharger - Lincoln, NH

    In my conversation with the Tesla Charging team members while at Lawrence, MA finishing things up there yesterday they indicated they were headed up to Lincoln, NH to commission the expansion this coming week (5/6-10). It will be great to see this one done!
  29. Tdreamer

    Supercharger - Lawrence, MA

    Was dark upon arrival as some final work was performed. Up five minutes later. Had a short but sincere conversation with a member of the crew. Thanked them profusely for what they do on behalf of the community.
  30. Tdreamer

    Supercharger - Lawrence, MA

    They won't have a schedule for Lowell. The site isn't done - it's between the contractor and utility to both finish - then Tesla gets back involved.
  31. Tdreamer

    Supercharger - Canton, MA

    For some time now you can release the MagicDock CCS adapter by pressing and holding the button on the charge handle until you hear a click of it being released. Much easier than going into the app and releasing it by selecting the current pedestal.
  32. Tdreamer

    Wiki Superchargers Visited

    Double-first Thursday. Perhaps the first two sites commissioned since the mass departure earlier in the week. Check-ins for 2024-05-02 - Salem, NH (#1367) (First to check-in) - shared with @dhkaufman - Canton, MA (#1368) (First to check-in) @dhkaufman opted to pass on the run to Canton as...
  33. Tdreamer

    Supercharger - Lowell, MA

    Encouraging status update on this site. The utility seems to have done most of their work to install new poles and overhead primary lines to get power near where the transformer primary conduit was run. Not sure if any further utility work is needed (other than an obvious missing transformer...
  34. Tdreamer

    Supercharger - Canton, MA

    It is indeed live! MagicDock is also working, although it’s unclear if it would work for non teslas yet.
  35. Tdreamer

    Supercharger - Lowell, MA

    Salem was commissioned today much, I think, to everyone's surprise. So the clear answer is yes. Lowell still needs work from the contractor to connect where they stopped their primary trench to wherever National Grid terminates their line work on a new pole. Lots of uncertainty still there...
  36. Tdreamer

    Supercharger - Salem, NH

    That was the commissioning team - hugs and thanks to them wherever they are.
  37. Tdreamer

    Supercharger - Woodbridge, VA - Richmond Hwy

    I've never had clarity on if the team that does maintenance is one-in-the-same with those that do commissioning. It's logical they would be the same, but logic does not always apply.
  38. Tdreamer

    Supercharger - Dover, NH

    I'm confident it will open - but it may very well be delayed coming online as Tesla sorts things out internally. It's really not clear how deep the cuts went on the staff that would be in the field commissioning new sites (or servicing existing sites for that matter), and those internally they...
  39. Tdreamer

    Supercharger - Lowell, MA

    From this picture, and the previous set, it appears there are new wires atop the poles running along the backside of the plaza to where the NG truck is.
  40. Tdreamer

    Supercharger - Lawrence, MA

    To clarify my previous response - I also have no doubt sites done or underway will be finished. It's just that with most if not the entire charging team let go from reports coming out today, it may take time for these sites to be brought online - more time than is typical. It's the sites that...
  41. Tdreamer

    Supercharger - Portsmouth, NH

    This, unfortunately, may very well be the reality of what lies ahead. Time will tell. It may be that the days of site hosts getting Tesla to put a supercharger at their location as this site undoubtedly is are over.
  42. Tdreamer

    Supercharger - Lawrence, MA

    Indeed. All sites ready to commission, underway and planned are up in the air. I have no doubt the sites like this one ready to light up and the ones underway will be finished and come online. With the hits today to the Tesla Charging team, I don't think anyone really knows yet how that...
  43. Tdreamer

    Supercharger - Morehead City, NC

    12 stall v3 (not v4) supercharger site plan including a 56kW PV system
  44. Tdreamer

    Shop for Pre-Track Day Tech/Safety Inspection Around Boston?

    Presumably MassTuning Trackfest at Palmer this coming weekend. https://www.motorsportreg.com/events/masstuning-trackfest-may-5-2024-palmer-motorsports-park-335423
  45. Tdreamer

    Supercharger - Lawrence, MA

    That's been there forever, and unrelated to the supercharger. I have it on good authority that the site is ready to go - just waiting on Tesla at this point I think.
  46. Tdreamer

    Shop for Pre-Track Day Tech/Safety Inspection Around Boston?

    Electrified Garage in Amesbury would be an option as well. They specialize in Tesla work, have done some amount of track performance upgrades on Tesla and have lots of experience overall. Is the work you are looking to have done related to the Model 3 Challenge by chance? Or is it some other...
  47. Tdreamer

    Anybody here waiting for Solar Roof?

    Yeah, I think those that got them did. Apparently for some of use that new process Tesla just implemented this year didn't work out due to some back end account linking/data issues (so I'm told). I'm still waiting to get a resolution on this after two support tickets raised through the app...