Has the transformer been installed yet? (assuming I've identified that correctly as Jurien).(From PlugShare)
I was at Jurien two days ago. The answer is, at that time, the transformer has not been installed. Hard to know when it might be done but Western Power are probably working very hard to maintain their reputation for tardiness.Has the transformer been installed yet? (assuming I've identified that correctly as Jurien).
Not for another three months , according to the update on last night's TOCWA AUA.Transformer to be installed behind this cabinet.
Not for another three months , according to the update on last night's TOCWA AUA.
Time to start agitating the Energy Minister to get WP to pull their finger out...
$0.60/kWh for the 150kW DC, $0.35 for 7kW AC (presumably single phase).The Williams site is online as of 2023-May-18. Excellent work!
Online but not yet operational according to the Chargefox app.The Albany site is on line as well.
The prime position of the Tesla Supercharger compared to the WAEV DC charger in Williams is worth about 20 cents per unit.$0.60/kWh for the 150kW DC, $0.35 for 7kW AC (presumably single phase).
So slightly cheaper than the Supercharger at $0.66/kWh