Hi everyone,
My Tesla Wall connector just arrived at my house yesterday but I am not sure whether to install it right away or wait until November to see what the AGL deal requires.
As many of you may know, AGL is offering from November a $1 a day plan to charge your Tesla as much as you want. I emailed they to ask if you require a separate circuit and AGL Smart meter and they said "most likely" but to wait until November for for details.
So my worry is that if I pay $1000 to install the wall connector now, switching to AGL in November may require it to be rewired to their specification. But if I don't wire it up now will I run short on charge? My daily commute is only about 40km so I guess I should be OK until November barring unforeseen circumstances. What do you reckon? Actually very excited about the AGL deal and it was one of the final pushes I needed to pull the trigger and purchase. Apparently they have an oversupply of electricity and see electric vehicles a way of reducing their overload. Thanks
My Tesla Wall connector just arrived at my house yesterday but I am not sure whether to install it right away or wait until November to see what the AGL deal requires.
As many of you may know, AGL is offering from November a $1 a day plan to charge your Tesla as much as you want. I emailed they to ask if you require a separate circuit and AGL Smart meter and they said "most likely" but to wait until November for for details.
So my worry is that if I pay $1000 to install the wall connector now, switching to AGL in November may require it to be rewired to their specification. But if I don't wire it up now will I run short on charge? My daily commute is only about 40km so I guess I should be OK until November barring unforeseen circumstances. What do you reckon? Actually very excited about the AGL deal and it was one of the final pushes I needed to pull the trigger and purchase. Apparently they have an oversupply of electricity and see electric vehicles a way of reducing their overload. Thanks