You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
You should update the thread for this supercharger over in the Texas Supercharger section. I'm not exactly sure which supercharger this is or I'd give you the exact link.
Moderator note: Merged in a thread regarding V3 chargers at this site, also moved this thread to the same sub-forum as other Texas Supercharger threads.
supercharge.info will update with the new number of stalls and power level once the new stalls are operational. It doesn't show anything for existing sites that are in the process of being expanded.
supercharge.info will update with the new number of stalls and power level once the new stalls are operational. It doesn't show anything for existing sites that are in the process of being expanded.
My apologies I had seen the charging photo and a lot of activity on the thread and incorrectly assumed (you know assumptions and all that) that is was ready. I’ll be more controlled about these things in the future so as not to annoy the great folks at supercharge.info. I’m just so ready for more supercharger locations. I know they’re focusing on increasing capacity in big cities but I need some gap filling!
Yesterday we went for a drive around SpaceX in McGregor and had to divert to the traffic mess of Waco for some electrons. We see that there is good progress at the Collin Street Bakery.
I wish the road construction was making the same rate of progress.
Yesterday we went for a drive around SpaceX in McGregor and had to divert to the traffic mess of Waco for some electrons. We see that there is good progress at the Collin Street Bakery.
I wish the road construction was making the same rate of progress.
I-35 is one of those freeways that will be forever under construction. Right now, it is torn apart in Waco. Five years ago it was 30 miles to the south in Temple. When Waco is done, it will be "upgraded" somewhere else. Maybe to handle flying cars. It will never be "finished".
Elon has talked about building electric aircraft. Probably within the decade (5 years Elon Time). These will undoubtedly carry the Tesla "T" logo.