Originally found by MarcoRP
1) ADDITION OF 6 SUPERCHARGER CABINETS
2) ADDITION OF 24 SUPERCHARGER STATIONS
3) INSTALLATION OF 1 SWITCH BOARD
4) REMOVE ON LIGHT POLE, RELOCATE ONE LIGHT POLE AND INSTALL TWO NEW 20' TALL LIGHT POLES
5) NEW ACCESSIBLE PATH OF TRAVEL WITH TWO CURB CUTS
1) ADDITION OF 6 SUPERCHARGER CABINETS
2) ADDITION OF 24 SUPERCHARGER STATIONS
3) INSTALLATION OF 1 SWITCH BOARD
4) REMOVE ON LIGHT POLE, RELOCATE ONE LIGHT POLE AND INSTALL TWO NEW 20' TALL LIGHT POLES
5) NEW ACCESSIBLE PATH OF TRAVEL WITH TWO CURB CUTS