Cabinets are installed, no transformer yet (the new transformer will be to the right of the cabinets, the pad is poured).
The left hand side of the charging stalls already has the sidewalk poured as well. Moving along.
The left hand side of the charging stalls already has the sidewalk poured as well. Moving along.