I stopped by here yesterday. This construction is the new VW Electrify America chargers. PlugShare has it listed for 7 CCS and 1 CHAdeMO fast charging stations. There’s a lot of electrify America stations showing as under construction across Florida. It may be a charging option if you’re in a bind and have a CHAdeMO adapter.Stopped in to charge at this site today, and there's some new construction/conduits being installed adjacent to the current 6 superchargers. Looks like there may soon be some additional superchargers here in the near future.
Someone in in contact with charged here yesterday
I were wondering what were those stations belong to when I brought my new M3 to the supercharger the first time on Oct 6th.I stopped by here yesterday. This construction is the new VW Electrify America chargers. PlugShare has it listed for 7 CCS and 1 CHAdeMO fast charging stations. There’s a lot of electrify America stations showing as under construction across Florida. It may be a charging option if you’re in a bind and have a CHAdeMO adapter.
Meant to mention that the Tesla app (see image) indicates the station is generally full (which means wait times) from 12PM - 8PM dailyThe “6” stall tallahassee charger has become a total cluster. Generally only 5 stalls seem to work. the furthest one from transformer 1B once while I was there didn’t work for a Model 3 but did (very slow rate) for a Model Y. Off and on people tape an OOO sign on 1B and locally it’s generally regarded as not viable.
There is no logical queue/parking for cars that show up and have to wait. you often see confusion/frustration with waiting Tesla drivers trying to advance. It does not help that car access to this plaza has an entrance with traffic running right in front of the Tesla stalls and inbetween where you wait in line for charging.
The half working 1B stall compounds the problem because a new car arrives seeing empty stall and assumes there’s no one waiting and plug into 1B. Then they seem to learn the situation that 1B isn’t charging them up and cars have been / are waiting. Invariably they pull away and then try to figure out where they belong in queue possibly with cars that arrived after them but knew 1B not viable and went straight to waiting area.
Hoping the two other fully constructed superchargers get online soon and alleviate this problem
It's insane that Tally has only had this single supercharger for so long. InsaneThe “6” stall tallahassee charger has become a total cluster. Generally only 5 stalls seem to work. the furthest one from transformer 1B once while I was there didn’t work for a Model 3 but did (very slow rate) for a Model Y. Off and on people tape an OOO sign on 1B and locally it’s generally regarded as not viable.
There is no logical queue/parking for cars that show up and have to wait. you often see confusion/frustration with waiting Tesla drivers trying to advance. It does not help that car access to this plaza has an entrance with traffic running right in front of the Tesla stalls and inbetween where you wait in line for charging.
The half working 1B stall compounds the problem because a new car arrives seeing empty stall and assumes there’s no one waiting and plug into 1B. Then they seem to learn the situation that 1B isn’t charging them up and cars have been / are waiting. Invariably they pull away and then try to figure out where they belong in queue possibly with cars that arrived after them but knew 1B not viable and went straight to waiting area.
Hoping the two other fully constructed superchargers get online soon and alleviate this problem