Hi. I haven't been able to get a straight answer as to if solar roof installations have started in Broward (Ft Lauderdale) FL. The Tesla energy specialist I spoke to said install should take 6-11 weeks but the tiles are only rated to 130 mph winds. I believe Broward code requires roofing to be rated at 155 mph. The specialist said that they have not been tested beyond 130. Does anyone know if installations are ongoing in Broward? Has Tesla applied for installs with the county?