Well, not really, but it sounds good, isn't it?
Yesterday I was invited to drive the "Alpenbrevet 2011". A night drive over around 14 alp passes and 900 Kilometer. Expected time: 20 hours.
50 cars, mainly oldtimers and one Tesla! Starting in two days at full moon!
Sounds impossible, and it is without proper preparation! It might be possible with a HPC on the right place, but like that I will do a shortened version. Between 600 and 800 Km with a charging stop of about 4 hours at 32 A ( and getting some sleep, too ).
Now I have to do the maths! I wil start hopefully fully loaded. The start is some 100 kilometers from my place and I'll have to work in the morning.
Yesterday I was invited to drive the "Alpenbrevet 2011". A night drive over around 14 alp passes and 900 Kilometer. Expected time: 20 hours.
50 cars, mainly oldtimers and one Tesla! Starting in two days at full moon!
Sounds impossible, and it is without proper preparation! It might be possible with a HPC on the right place, but like that I will do a shortened version. Between 600 and 800 Km with a charging stop of about 4 hours at 32 A ( and getting some sleep, too ).
Now I have to do the maths! I wil start hopefully fully loaded. The start is some 100 kilometers from my place and I'll have to work in the morning.