Guys, just a heads up.
I was probably the first to get v6.1 in the UK, and spotted a problem with charging at my office 22kW charger. It's a brand new unit, so I put it down to an incompatibility.
However, today I tried an Ecotricity point and it's definitely a problem with v6.1 :crying:
In summary, maximum charge capped at c.17 miles, and a warning in the drivers dash. 22 mins of charging gave me 7 miles. This is obviously slower than even a 7kW charger
I'll be on the phone to Tesla shortly, but thought it worth posting here, in case anyone is planning on using an Ecotricity point before Tesla can roll out a fix.
I was probably the first to get v6.1 in the UK, and spotted a problem with charging at my office 22kW charger. It's a brand new unit, so I put it down to an incompatibility.
However, today I tried an Ecotricity point and it's definitely a problem with v6.1 :crying:
In summary, maximum charge capped at c.17 miles, and a warning in the drivers dash. 22 mins of charging gave me 7 miles. This is obviously slower than even a 7kW charger
I'll be on the phone to Tesla shortly, but thought it worth posting here, in case anyone is planning on using an Ecotricity point before Tesla can roll out a fix.