You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
It will also be great to see Mahwah come online in 2022.
Most towns would let them open with a promise (or a bond in extreme cases) of complying with their conditions within a specified amount of time.The town was very specific in stating that approval for the site would require landscaping so that the site would be hidden from the road (Chestnut Ridge Road). It specifically mentioned that the town wanted 5' shrubbery around the site. Though the site looks like it is ready (I drove by today), I don't see the required landscaping. It is January and they could be waiting for warmer weather to plant. Perhaps that is what is holding back the opening of this sorely needed supercharger.
Good news everyone, I work across from the supercharger. I saw workers installing the meter this week and they told me that they ran into issues with the local electricity provider but it's getting fixed, they told me it should be online in the next 4 weeks!
Swung by today and still not up and running. What's the holdup here?
Paramus is jammed all the time and Nyack is too far....
Good news everyone, I work across from the supercharger. I saw workers installing the meter this week and they told me that they ran into issues with the local electricity provider but it's getting fixed, they told me it should be online in the next 4 weeks!
It’s up and running. Not all stalls work, however.I haven't seen any workers since then on the site, they are probably waiting for some paperwork or something from the company as the installation seems to be finished. I will check it everyday I'm at work and as soon as it's live I'll send you guys a message