  1. C

    Supercharger - San Jose, CA - Almaden Rd (under construction Apr 2024, 12 V3 stalls)

    Drove by today on main road and there was active construction going on behind the green fence screen. V4 Superchargers were on pallets in groups of 4, but unwrapped.
  2. C

    Supercharger - San Jose, CA - W Capitol Expy (under construction Mar 2024, 12 V3 stalls)

    This is what it looked like today. 4 stall pads on either side of the utility pads.
  3. C

    Supercharger - San Jose, CA - 1275 Lincoln Ave (Permit Found, 12 stalls)

    See attached Supercharger layout design plans included with the tree removal info
  4. C

    Supercharger - San Jose, CA - 1275 Lincoln Ave (Permit Found, 12 stalls)

    Here is my photo of the rear of the 1275 Lincoln Ave property where all the heavy equipment will go. Superchargers will be installed along the fenceline up to the back of the 1275 Lincoln Ave bldg Jan 2024 - Approval received to remove a few trees in the rear area to make that space for the...
  5. C

    Supercharger - San Jose, CA - W Capitol Expy (under construction Mar 2024, 12 V3 stalls)

    Drove by this morning. Active construction was underway, with several people with PG&E vests. Today it looked like they had just poured concrete for a utility pad and were pouring concrete for redoing the sidewalk that was cut into to make the PG&E connection, plus possibly other things I could...
  6. C

    Supercharger - San Jose, CA - Meridian Ave. (under construction Mar 2024, 8 V3 stalls)

    Checked out the site yesterday. Looks like waiting on PG&E to do the final install. Note that these are going to be V4 Superchargers. As Bernal Rd will probably be finished before this one, this one might be the second V4 in San Jose, and the third in the County (Los Gatos at Los Gatos Blvd &...