Hi folks,
I recently had a 8.16kW PV system with Powerwall+, Powerwall 2, and Gateway 2 installed, awaiting PTO. I have a 125A main service panel with a 100A breaker feeding into the backup panel which all of my home loads were relocated in to. I am planning to have a HPWC installed but the few...