Today I was really excited to see the electric meter installed! AND i flagged down the PSEG guys, they told me its all ready waiting for township final inspection and Tesla to do some calibration. Of course I gave them a tour of the car and anwsered all their questions AND I learnedthat they are installing a charging station in the Cranberry area off the NJT i would assume that is exit 8a, they said they are ready to break groun! The tesla guy was reported to be working on the Edison location.
Google Maps
https://lh6.googleusercontent.com/-...RI/AAAAAAAAAEc/bSvaV14FqGk/s1600/IMG_2814.jpg
Google Maps
https://lh6.googleusercontent.com/-...RI/AAAAAAAAAEc/bSvaV14FqGk/s1600/IMG_2814.jpg