Supercharger - San Juan Capistrano, CA (7 V2 stalls)

This site may earn commission on affiliate links.
Another supercharger is now under construction and this thread is dedicated to the periodically updates and pictures. The location is in the Union Bank parking lot at 31971 Camino Capistrano San Juan Capistrano, CA 92675.

Google Maps - http://goo.gl/RzOzRB
Tesla Wiki Supercharger Map - http://www.teslawiki.net/supercharger/

I also borrowed a few pictures from another thread. Thanks callmesam for the pictures!

IMG_0343[1].JPG

IMG_0341[1].JPG


Untitled.jpg
 
Great intel. I was going to guess 3 weeks, but with the holidays coming, not surprised it will take a bit longer. Hopefully the utility inspections and permitting will be seamless.

I'm surprised its still taking them 5 weeks. This link from TechCrunch has a Tesla document that shows 5 weeks being the maximum construction time and 3 weeks being the minimum. With all the superchargers that are out there now, I'm surprised they haven't made the process more efficient and cut down on the 5 week time frame. Unless the weather is also a factor. Still great news. I'm still surprised with how many are under construction right now.

http://techcrunch.com/2013/07/26/in...d-commitments-of-electrifying-road-transport/
 
I'm surprised its still taking them 5 weeks. This link from TechCrunch has a Tesla document that shows 5 weeks being the maximum construction time and 3 weeks being the minimum. With all the superchargers that are out there now, I'm surprised they haven't made the process more efficient and cut down on the 5 week time frame. Unless the weather is also a factor. Still great news. I'm still surprised with how many are under construction right now.

http://techcrunch.com/2013/07/26/in...d-commitments-of-electrifying-road-transport/

Weather in Southern California is NOT a factor. If the crew is claiming 5 weeks, that might be sum total amount of time (including inspections) before the "Grand Opening". Like other SC, this one will likely be done sooner with a soft opening a week before.
 
Weather in Southern California is NOT a factor. If the crew is claiming 5 weeks, that might be sum total amount of time (including inspections) before the "Grand Opening". Like other SC, this one will likely be done sooner with a soft opening a week before.

Could be some buffer in there. Or holiday season conflicts. I didn't press him on the schedule. Regardless, it won't be long now...
 
subscribing to this thread.

looking at buying a tesla while staying with my uncle in Mission Viejo. Won't have a garage/powerpoint at the house, but would love to be able to use this supercharger as a pseudo-gas station. :p
 
subscribing to this thread.

looking at buying a tesla while staying with my uncle in Mission Viejo. Won't have a garage/powerpoint at the house, but would love to be able to use this supercharger as a pseudo-gas station. :p

Are you going to ship it down under? If so, just know that the Superchargers outside of USA / Canada have a significantly different plug.