You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Hard to believe Atascadero is so far along without any previous note of it here. A bit surprised at location as the distance between Atascadero and Buelton is only 80 miles. Based on this, I should think Salinas ought to be next, to take some of the load off of Gilroy. Any spies in Salinas?
Just found the attached picture while researching my trip to Nor Cal on Plughsare. 8 bays have been installed at Rabobank.
http://www.plugshare.com/api/_uploads/locations/image_5778.jpg
I see Salinas scheduled for "Fall 2013". So what do you think "Fall" means? Sept to Nov?Salinas isn't on the Summer 2013 map. The only locations for Summer 2013 in California are Atascadero, Buellton, Oxnard, and San Juan Capistrano. Only Atascadero and Buellton have been spotted, AFAIK. The other two are rumored, but match up with the map.
Hard to believe Atascadero is so far along without any previous note of it here. A bit surprised at location as the distance between Atascadero and Buelton is only 80 miles. Based on this, I should think Salinas ought to be next, to take some of the load off of Gilroy. Any spies in Salinas?
Here's an excellent update from a Porsche blog:
Porsche 914E Electric Conversion: Atascadero Tesla Supercharger Station
- - - Updated - - -
I just talked to Rabobank and was advised the SC are installed and expect to be powered "this weekend". Looks like it is very close.
I'm betting on casual tweets from Elon as each goes live. That's about as sophisticated as communications get at TM these days.Anybody know when Tesla will make an official announcement about the sites? Probably waiting for a big announcement when all are up and running, but I'd sure like to start planning a road trip for the summer.....